May 22-24, 2009

Sextupole alignment

[Friday, May 22 ?]

  • Experiments with all sextupoles off
    • Sextupole misalignment (Be sure skew sextupoles are off)
      • Flatten orbit (including in region of xBSM bump)
      • Measure and correct phase and coupling
      • On coupling resonance measure tunesplit vs sextupole change (vertical offset)
      • Use vertical bump peaked in sextupole to zero induced coupling and determine sign of offset
      • Off of coupling resonance measure tune shifts vs sextupole (horizontal offset)
    • Minimize vertical emittance (sextupoles off)
  • Measure dispersion
  • Measure vertical orbit
  • Use skew quads and vertical steering to simultaneously correct dispersion, coupling, and vertical orbit
  • Measure lifetime (5mA - 2mA). Run [cesr.gdl.inp]LOG_LIFE_DATA_DLR to collect current and lifetime vs time data

  • Measurement with sextupoles powered [Saturday, May 23]
  • Sextupole centering
    • Use coupling measurement and orbit bumps to center beam in sextupoles (45E is a good candidate)
  • Sextupole 45E - Tunesplit measurement from May 17 indicates 6mm vertical offset See above . (The vertical steerings are included in the plot. Most have less than 100cu and there is no evident correlation with the measured misalignment.)
    • Calibrate
    • Coupling measurements with 45E at two very different settings

    Gain mapping

    [Sunday, May 24]
    • Use horizontal and vertical bumps to map out a 3X3 grid in a BPM (25W?)
    • The spacing between grid points should be about 5mm vertically and 10mm horizontally
    • Repeat in at least one other BPM

    Close bumps

    • Create and close hbumps and vbumps or as needed for above