May 29-31, 2009
-
-
LET [Friday 5/29 dlr,jsh 14-20]
- Load two family sextupole distribution and xquneing knobs
- Confirm coupling due to 23W and any other suspects
- Turn off offset sextupoles. Also sextupoles 8e, 9e in xBSM bump?
- Measure and minimize coupling/dispersion/vertical orbit simultaneously
- Measure lifetime
- Check out betasing knobs for xBSM test
Gain mapping/ calibrate steerings [Saturday 5/30 jsh, dcs (14-18), dlr (17-20)]
- Collect 4X4 grid at BPM 9W, 10W (CBPM system), 23W (new BPM), and two others on old system where we can find convenient bumps
- Close bumps as required.
- Calibrate (identify) bad steering near L3 that prevents CESRV-flatten from converging
1.8GeV optics [Sunday 5/31 dlr(11-15),dcs(15-18)]
- With stored beam reduce energy (CSR ENERGY) to 1.8GeV
- Correct orbit,phase,coupling at 1.8GeV with respect to cta_1800mev_20090530.lat
- Tune injection
- Document route
- NMR? dipole?