May 29-31, 2009

LET [Friday 5/29 dlr,jsh 14-20]
  • Load two family sextupole distribution and xquneing knobs
  • Confirm coupling due to 23W and any other suspects
  • Turn off offset sextupoles. Also sextupoles 8e, 9e in xBSM bump?
  • Measure and minimize coupling/dispersion/vertical orbit simultaneously
  • Measure lifetime
  • Check out betasing knobs for xBSM test
Gain mapping/ calibrate steerings [Saturday 5/30 jsh, dcs (14-18), dlr (17-20)]
  • Collect 4X4 grid at BPM 9W, 10W (CBPM system), 23W (new BPM), and two others on old system where we can find convenient bumps
  • Close bumps as required.
  • Calibrate (identify) bad steering near L3 that prevents CESRV-flatten from converging
1.8GeV optics [Sunday 5/31 dlr(11-15),dcs(15-18)]
  • With stored beam reduce energy (CSR ENERGY) to 1.8GeV
  • Correct orbit,phase,coupling at 1.8GeV with respect to cta_1800mev_20090530.lat
  • Tune injection
  • Document route
  • NMR? dipole?