June 5, 2009
-
-
LET [Friday 6/5 - dlr,jsh,dcs (1600-2000)]
- Restore csr set 127218 - (xray route)
- Flatten orbit outside bsm region
- Measure and minimize coupling/dispersion/vertical orbit simultaneously
- Measure lifetime
- Guided by xbsm signal tune bump using HBSAVING 1,2 VBSAVING 1,2, HBUMPING 79,80, VBUMPING 75, 73, 71, 70
Gain mapping ? [Saturday 6/6 - jsh, dcs (1600-2000)]
- Identify and close bumps for mapping CBPM 6W,7W,8W
- Collect data
1.8GeV optics [Sunday 6/7 - dlr,jsh (1400-2000)]
- Create lattice. Two family sextupoles.
- Create 1.8GeV route
- Create LATCHING knob - (Zero skew quad coefficients)
- Initial lattice is cta_2085mev_20090516_2fam.lat - Final lattice is cta_1800mev_20090607.lat
- /home/dlr/cesrv/lat2lat/cta_1800mev_20090607/
- Edit for VMS (# -> $ !, fff -> $ fff
- Copy to user$disk:[cesr.dlr.lat2lat]lat2lat_load.com
- Adjust PNMR parameters
- With stored beam reduce energy (CSR ENERGY) to 1.8GeV. Also LATCHING and
QTUNE
- Correct orbit,phase,coupling at 1.8GeV with respect to cta_1800mev_20090530.lat
- Tune injection
- Document route
- NMR? dipole?