June 5, 2009

LET [Friday 6/5 - dlr,jsh,dcs (1600-2000)]
  • Restore csr set 127218 - (xray route)
  • Flatten orbit outside bsm region
  • Measure and minimize coupling/dispersion/vertical orbit simultaneously
  • Measure lifetime
  • Guided by xbsm signal tune bump using HBSAVING 1,2 VBSAVING 1,2, HBUMPING 79,80, VBUMPING 75, 73, 71, 70
Gain mapping ? [Saturday 6/6 - jsh, dcs (1600-2000)]
  • Identify and close bumps for mapping CBPM 6W,7W,8W
  • Collect data
1.8GeV optics [Sunday 6/7 - dlr,jsh (1400-2000)]
  • Create lattice. Two family sextupoles.
  • Create 1.8GeV route
  • Create LATCHING knob - (Zero skew quad coefficients)
    • Initial lattice is cta_2085mev_20090516_2fam.lat - Final lattice is cta_1800mev_20090607.lat
    • /home/dlr/cesrv/lat2lat/cta_1800mev_20090607/
    • Edit for VMS (# -> $ !, fff -> $ fff
    • Copy to user$disk:[cesr.dlr.lat2lat]lat2lat_load.com
  • Adjust PNMR parameters
  • With stored beam reduce energy (CSR ENERGY) to 1.8GeV. Also LATCHING and QTUNE
  • Correct orbit,phase,coupling at 1.8GeV with respect to cta_1800mev_20090530.lat
  • Tune injection
  • Document route
  • NMR? dipole?