LET machine studies plan,
December 18-23, 2009
Friday, December 18, (19:00-24:00) js, dcs
- Excercise CESRV, orbit, phase, ac_eta
- Take zero vertical corrector orbit. (This is so we can keep track of the quad moves resulting from the ongoing owl survey.)
- ORM: all skew quads off, and time permitting with corrected coupling
- Compare calibration of vertical steerings with calibration file and look for outliers
Saturday, December 19, (19:00-24:00) dcs, dlr
- Take zero vertical corrector orbit.
- Measure and minimize orbit errors, ac_eta, coupling using steerings, skew quads
Sunday, December 20
(14:00-19:00) js, (dcs- on call)
- Take (and record) zero vertical corrector orbit.
- Beam size vs bunch current
- BIG D route, POSXRAY - use slow xbsm scan to measure beam size for bunch currents 5mA to 0.5mA.
- Repeat at 3MV total RF accelerating voltage if the nominal scan looks interesting
- For reference, here is the measurement that we made with the FZP turn by turn on November 30.
beam size vs current
- Lifetime vs accelerating voltage for electrons and positrons (Run [cesr.gdl.inp]lLOG_LIFE_DATA_DLR to collect data. Note file name)
- Positrons: measure and correct orbit, phase, coupling, (and eta)
- Measure lifetime 5mA - 1mA at 6,5,4,3,2,1 MV
- The control to adjust RF volrtage is CESR RF -> DRF CAV FLD 1 (west cavities) and DRF CAV FLD 2 (east cavities)
- Electrons: measure and correct orbit, phase, coupling, (and eta)
- Measure lifetime 5mA - 1mA at 6,5,4,3,2,1 MV
Monday, December 21
(19:00-24:00) js, dlr
- Take zero vertical corrector orbit.
- Minimize electron emittance. Monitor with c-line xbsm
Tuesday, December 22
(19:00-24:00) js, dcs
- Record zero corrector orbit
- Load Rohan skew quad corrections and measure phase/coupling
- Beam size measurements
- Turn off feedback gain AND feedback amplifiers (The transverse feedback amplifiers are in room 101. The longitudinal feedback amplifier [Press the standby button] is on a cart near the east RF transmitter.)
- Positrons: measure and correct orbit, coupling, dispersion as required
- Measure beamsize vs RF voltage, 1,2,3,4,5,6MV
- Measure beam size vs horizontal tune (210kHz - 235 kHz)
- Measure effect on beam size of turning off only the vertical amplifier vs turning off only the horizontal amplifier.
- (When you are finished with the feedback amplifier experiments be sure to restore feedback amplifier power)
- Test mode correction
Wednesday, December 23
(15:00-19:00) dcs