Hi Dave, I am pleased that you want to give the injection problem a try. Unfortunately, I do not have a complete and consistent mechanical and optical description of the injection from the external beamline through the inflector. Here is what I have. For orientation, I give below the last few lines of an annotated Transport file which I made from Hugh Brown's btraf. Both programs use lumped elements, so the translation was straightforward, albeit tedious. After the SWIC there is a 0.806 m drift to the backleg of the magnet. The hole in the backleg is 1.898 m. At this point there is a matrix which approximates the beam motion in the hole and the magnet fringe field. Hugh Brown obtained this matrix from a tracking calculation. I do not believe that this calculation specifically made it to a g-2 note. Next is a 0.300 m drift to the entrance coil of the inflector, followed by the 1.7 m inflector, and then the exit coil of the inflector. I did obtain rudimentary field maps from Hugh Brown in 2005 of the field in the hole, inflector and ring. I attach these three files, and a version in Excel. Wuzheng Meng has done a detailed inflector field calculation. This field is in G2MIGTRACE. I have the file, and I could send it to you. It is 14 MB. Hugh Brown did write several g-2 notes concerning injection, #29, #58, and #76, among others. #76 has very useful simple drawings and some reference to tracking calculations. There are other g-2 notes on inflection matters, many by Bill. I attach an Autocad drawing which is the basis for Fig 1 of the inflector paper. I have tried to reconcile features in this drawing with the numbers in the Transport file and field maps. Regardless of the details, there is a considerable distance from the last quad to the exit of the inflector, of the order of five meters. I also attach an Autocad drawing of the entire BNL beamline and ring. Although it is certainly frustrating only to have incomplete information, it may be enough to make some breakthrough. I should be pleased to help out if I could. Regards, Paul 3. 0.508 ; 5. 0.711 10.767 9.84 /Q29/ ; (length = 0.711 m, pole tip field of 10.767 kg = 2.77850 kg/in x 3.875in) 3. 0.457 ; (D710) (slit 6.75in x 3.75in) 3. 0.457 ; 3. 0.0254 /W712/ ; (SWIC) 3. 0.806 /FBAK/ ; (2in radius) 6. 1. 5.04 3. 5.04 ; 3. 1.898 /HOLE/ ; 6. 1. 5.04 3. 5.04 ; (btraf gives fringe field matrix elements) (Hor 0.871056 -3.9877in 0.0149415/in 1.079686) (Ver 1.047201 6.1164in -0.012641/in 0.883962) (units of btraf R12 in/rad and R21 rad/in) (units of Transport R12 cm/mr and R21 mr/cm ) (verified that both H and V have unit determinant) 14. 0.871056 -0.0102875 0. 0. 0. 0. 1. ; 14. 5.88248 1.079686 0. 0. 0. 0. 2. ; 14. 0. 0. 1.047201 0.0155356 0. 0. 3. ; 14. 0. 0. -4.97677 0.883962 0. 0. 4. ; 14. 0. 0. 0. 0. 1. 0. 5. ; 14. 0. 0. 0. 0. 0. 1. 6. ; 3. 0.300 ; 3. 0.005 /ENTR/ ; (COIL) (inflector 0.709in x 2.047in) 6. 1. 0.9 3. 2.8 ; 3. 1.68986 ; 6. 1. 0.9 3. 2.8 ; (inflector 0.709in x 2.047in) 3. 0.005 /EXIT/ ; (COIL)