27-March to 18-April 2012 Machine Studies Conditions

2012-03-29-0900 Recover 2.085GeV conditions
2012-03-29-1400: Feedback checkout
2012-03-29-2000: Tune multibunch injection
2012-03-30-0600: Recover conditions
2012-03-30-1000: D-line alignment
2012-03-30-1700: BPM gain correction
2012-03-30-2100: BPM centering
2012-03-31-0400: BPM tilt calibration
2012-03-31-0800: D-line alignment
2012-03-31-1400: xBSM software checkout
2012-03-31-1700: Tune Multibunch injection
2012-03-31-2000: RFA mitigation characterization
2012-04-01-0600: Recover 1.8 GeV conditions
2012-04-01-1000: Recover 2.3 GeV conditions
2012-04-01-1400: L3 synch light setup
2012-04-01-1800: Ecloud dynamics
2012-04-02-0600: Coupling vs current
2012-04-02-1000: D-line characterization
2012-04-02-1600: Electron cloud stability
2012-04-02-2200: Horizontal beam size monitor

Tuesday, April 3
2012-04-03-1400: Startup
2012-04-03-1500: Tune multibunch injection
2012-04-03-1800: Time resolved RFA vs chicane dipole
2012-04-03-2400: TE wave cyclotron resonance

Wednesday, April 4
2012-04-04-0600: Time in stripline kicker for tune shift measurements
2012-04-04-0700: Ecloud tuneshifts
2012-04-04-1600: Tune multibunch injection
2012-04-04-1900: RFA characterization/TE Wave SPU

Thursday, April 5
2012-04-05-0600: C-line xBSM alignment
2012-04-05-1200: D-line pre-experiment setup
2012-04-05-1300: Horizontal beam size
2012-04-05-1900: Tunescan

Friday, April 6
2012-04-06-0600: D-line xBSM characterization
2012-04-06-1100: D-line pre-experiment setup
2012-04-06-1200: E-cloud stability studies
2012-04-06-1800: Streak camera setup

Saturday, April 7
2012-04-07-0600: Stripline kicker time in for tune shift measurements
2012-04-07-0700: Injection tune up for tuneshift measurements
2012-04-07-0800: Ecloud tuneshifts
2012-04-07-1600: D-line pre-experiment setup
2012-04-07-1700: Tunescan

Sunday, April 8
2012-04-08-0600: D-line setup
2012-04-08-0700: IBS
2012-04-08-1700: Ecloud stability studies

Monday, April 9
2012-04-09-0400: Tune tracker
2012-04-09-0600: C-line xBSM alignment
2012-04-09-1200: Instrumentation
2012-04-09-1600: d-line pre-experiment setup
2012-04-09-1700: IBS

Tuesday, April 10
2012-04-10-0400: Tune tracker
2012-04-10-0700: Energy change to 4 GeV
2012-04-10-1400: Recover conditions
2012-04-10-1800: Time in strip line kicker
2012-04-10-1900: ecloud tunshifts

Wednesday, April 11
2012-04-11-0500: Tune tracker
2012-04-11-0800: D-line xBSM alignment
2012-04-11-1400: D-line xBSM pinhole optic width
2012-04-11-1500: Imaging with CA
2012-04-11-1900: RFA characterization
2012-04-11-2300: BPM tilts

Thursday, April 12
2012-04-12-0800: Recover 2.085 GeV conditions
2012-04-12-1000: c-line xBSM calibrations
2012-04-12-1800: d-line pre experiment setup
2012-04-12-1900: ecloud instability studies

Friday, April 13
2012-04-13-0600: 1.8 and 2.3 GeV correct orbits for c-line
2012-04-13-1000: c-line characterization of 1.8 and 2.3 GeV
2012-04-13-1400: CBPM studies
2012-04-13-1800: d-line pre experiment setup
2012-04-13-1900: IBS

Saturday, April 14
2012-04-14-0600: D-line setup
2012-04-14-0700: ecloud instability studies
2012-04-14-1500: IBS
2012-04-14-2300: CBPM stability

Sunday, April 15
2012-04-15-0700: multibunch tuneup for RFA mitigation measurements
2012-04-15-0900: RFA bunch spacing mitigation measurements
2012-04-15-1700: vBSM vertical beam size
2012-04-15-2100: RF signals from BPM 13W
2012-04-15-2300: Tune tracker
2012-04-16-0100: BPM stability

Monday, April 16
2012-04-16-0600: c-line 1.8 and 2.3 GeV
2012-04-16-1000: d-line diode response
2012-04-16-1400: c-line experiment setup
2012-04-16-1500: ecloud instability
2012-04-16-2200: IBS

Tuesday, April 17 2012-04-17-0700: multibunch injection tuneup for mitigation studies
2012-04-17-0900: RFA characterization/TE Wave SPU
2012-04-17-1600: Time in stripline kicker for tune shift measurements
2012-04-17-1700: Ecloud tuneshifts