19-November to 21-December 2012 Machine Studies Conditions

2012-11-19-0800: Witness eliminator
2012-11-19-0900: SPU witness
2012-11-19-1300: SPU solenoid
2012-11-19-2100: Tilt/zero corrector

2012-11-20-1400: Recover 2.085 GeV conditions
2012-11-20-1700: Check out feedback and longitudinal instability at 2.085 GeV
2012-11-20-2100: BPM gain correction

2012-11-21-0700: stability studies
2012-11-21-1400: c-line check
2012-11-21-1500: BPM centering

2012-11-25-0700: corrector calibration
2012-11-25-0900: managed v15 optics
2012-11-25-1300: zero eta optics
2012-11-25-1700: vBSM horizontal beam size

2012-11-26-0700: Witness eliminator
2012-11-26-0800: c-line alignment
2012-11-26-1400: SPU witness bunch
2012-11-26-1800: CBPM characterization

2012-11-27-1400: Recover 2.085 GeV
2012-11-27-1600: SPU - vs solenoid

2012-11-28-0700: d-line alignment
2012-11-28-1300: 4ns current monitor systematics
2012-11-28-2100: Streak camera setup

Thursday, November 29, 2012
2012-11-29-0600: c-line alignment
2012-11-29-0800: Low emittance tuning (electrons)
2012-11-29-1200: Multibunch injection tuning for RFA measurements
2012-11-29-1600: RFA mitigation

Friday, November 30
2012-11-30-0700: Stability studies testing
2012-11-30-1400: Stability studies setup with d-line xBSM
2012-11-30-1700: Tune low emittance
2012-11-30-2100: vBSM vertical beam size

Saturday, December 1
2012-12-01-0600: d-line exp setup and let
2012-12-01-0800: precursor study
2012-12-01-1600: preparation for TE wave study
2012-12-01-1700: TE Wave - L3 -2GeV

Sunday, December 2
2012-12-02-0700: d-line and c-line setup
2012-12-02-0900: Tune vs current electrons and positrons
2012-12-02-1100: IBS(1) electrons & positrons
2012-12-02-1900: vBSM PMT characterization

Monday, December 3
2012-12-03-0800: xbsm d-line systematics
2012-12-03-1300: tilt/zero corrector
2012-12-03-1700: PMT characterization
2012-12-03-2100: digital tune tracker

Tuesday, December 4
2012-12-04-1400: Recover 2.085 GeV multibunch injection
2012-12-04-1600: xbsm d-line setup
2012-12-04-1800: Precursor studies

Wednesday, December 5
2012-12-05-0800: D-line systematics study
2012-12-05-1400: d-line exp setup and c-line
2012-12-05-1500: IBS(2)

Thursday, December 6
2012-12-06-0600: Longitudinal instability
2012-12-06-0900: Recover 2.3 GeV conditions
2012-12-06-1100: xbsm d-line setup
2012-12-06-1400: IBS(3)
2012-12-06-2000: PMT characterization

Friday, December 7
2012-12-07-0600: Longitudinal instability
2012-12-07-0800: Recover 1.8GeV conditions
2012-12-07-1100: d-line xBSM exp setup
2012-12-07-1400: IBS(4)
2012-12-07-2000: Recover conditions
2012-12-07-2200: Digital tune tracker

Saturday, December 8
2012-12-08-0600: LET and D-line exp setup
2012-12-08-0800: Damping studies
2012-12-08-1600: Multibunch injection tuneup
2012-12-08-1700: TE wave

Sunday, December 9
2012-12-09-0700: d-line xbsm setup 2012-12-09-0900: IBS(5) 2012-12-09-1600: d-line setup 2012-12-09-1700: stability studies

Monday, December 10
2012-12-10-0200: IBS(6)
2012-12-10-0700: energy change
2012-12-10-0900: D-line xBSM alignment
2012-12-10-1400: SPU solenoid
2012-12-10-2200: Digital tune tracker

Tuesday December 11
2012-12-11-1400: Recover 4 GeV
2012-12-11-1600: coded aperture imaging
2012-12-11-2200: SPU witness bunch
Wednesday December 12
2012-12-12-0600: Recover 5.3 and tune multibunch injection
2012-12-12-0900: Coded aperture burn test
2012-12-12-1000: TR-RFA
2012-12-12-1800: TR-RFA cable switch
2012-12-12-1900: RFA mitigation
Thursday December 13
2012-12-13-0300: SEY sample processing with 200mA electrons
2012-12-13-0800: TR-RFA
2012-12-13-1700: Recover 4GeV and tune emittance
2012-12-13-1800: xBSM ca imaging
Friday, December 14
2012-12-14-0500: Longitudinal feedback
2012-12-14-0800: Recover 2.085 GeV conditions
2012-12-14-0900: c-line exp setup
2012-12-14-1300: Stability of chromaticity
2012-12-14-2000: Tilt/zero corrector
Saturday, December 15
2012-12-15-0700: c-line optics study
2012-12-15-1100: electron stability vs chromaticity
2012-12-15-2000: RFA mitigation and TE Wave/SPU
Sunday, December 16
2012-12-16-0800: d-line bunch slicing
2012-12-16-1200: c-line exp setup
2012-12-16-1400: ODR bumps
2012-12-16-2000: IBS(7)