| Time period |
Job |
Suspect |
| Aug. 04 |
reconfigure slit system to
bypass broken ADC slits |
Detlef
Smilgies |
| clean and resolder white beam
slits |
Jim Savino |
|
| design and manufacture of new
mounts for 4"
multilayers |
Alan Pauling |
|
| install and leak-check new mounts |
Bob Seeley |
|
| install and commission new 4"
multilayers (Mo:B4C, 30A) |
Detlef Smilgies | |
| Sep. 04 |
new video patch panels |
Tony Lloyd |
| new CCD patch panels |
Tony Lloyd |
|
| 8 new outlets for clean 110V AC
power |
Dave Jones |
|
| 3-point mount for optical table |
Jerry
Houghton |
|
| 2nd leg for optical bench |
Jerry Houghton | |
| network switch between CCD
computer and control computer |
Frank Labonte |
|
| Oct. 04 |
rewiring video channels |
Detlef
Smilgies |
| rewiring cables for CCD-spec
interface |
Detlef Smilgies | |
| new monitor ion chamber |
Alan Pauling |
|
| cooling water interlock for
Medoptics |
Tony Lloyd |
|
| new triax cables for Medoptics |
Ted Luddy |
|
| improved insulated mount for CCD |
John Kopsa |
|
| interface plate for new ADC slit |
John Kopsa |
|
| new binning mode for Medoptics |
Arthur Woll |
|
| setting up new ADC slit |
Detlef
Smilgies |
|
| SAXS flight path mark 2 |
Detlef
Smilgies |
|
| GISAXS sample stage and GISAXS
beam stop mark 2 |
Detlef
Smilgies |
|
| Nov. 04 |
reinstalled old holder for 3"
multilayers |
Chris
Connolly |
| tested 15A W:B4C multilayers from A. Kazimirov for high energies up to 30 keV | Detlef
Smilgies |
|
| Jan. 05 |
moved the Be window upstream to
the end of the monobox |
Chris Connolly |
| Feb. 05 |
design for ion chamber and slit
support on CHESS xz stage in D-cave |
Detlef
Smilgies |
| design for two CF-6 3/4" to KF50
adapter for incident flightpath Kapton windows |
Alan Pauling |
|
| moved air conditioner unit to
create more space for large scanner of Woll et al. |
Jerry
Houghton |
|
| Mar. 05 |
machined
new incident flight path parts |
John Kopsa |
| modified hygrometer and
overpressure valve assembly |
Chris
Connolly |
|
| installed, cabled, and tested
"si"
slits and "Itot" ion chamber in D cave |
DS |
|
| installation of new SPEC macro structure (Sorensen, Woll, Smilgies) | Phil Sorensen |
|
| installation of SPEC multiple
configuration set-up: saxs / image / radio |
DS |
|
| cleaned up specuser directory on
d1 |
DS | |
| macros for moving data
directories to "offsite" mass storage |
Phil Sorensen |
|
| redid cabling from East cross connect patch panel to D-line main control panel | Tony Lloyd |
|
| got station PC off the floor | Chris Connolly | |
| SAXS parts (sample holder for capillaries, beam stop, to be used with CHESS xz stage) | DS |
|
| SAXS accessories (thin-walled
glass capillaries, microdispenser) |
DS | |
| main optical table maintenance |
Jerry
Houghton |
|
| align Kapton window and 6" beampipe through cave-hutch shielding wall | DS | |
| reassemble and commission reconfigured SAXS setup (mark 3) | DS | |
| improve old GISAXS stage: center
of samaz rotation at sample, closed sample cell |
DS | |
| local mirror in hutch (CHESS
repolished quartz mirror, cleaned mirror piece) |
Conolly/Savino |
|
| one 3rd generation ADC slit is
working, one repaired, one to be tested |
DS | |
| improved Medoptics mount;
Medoptics was rotated 90 deg for easier use with "fit2d" |
DS | |
| Jul. 05 |
second ADC slit configured and
commissioned (sh) |
DS |
| OSMIC 15 A W:B4C multilayers
commissioned at 30 keV |
DS |
|
| vacuum flight path components
based on ISO-100/KF-50 ordered |
DS |
|
| vacuum sample cell designed and
ordered |
DS |
|
| simple solvent vapor cell built
and tested |
DS, PB |
|
| moved garage door controller lower | DS |
|
| macro motors for sg and sh slits |
DS |
|
| second optical table for
detectors (Medoptics) assembled |
Jerry
Houghton |
|
| motor wiring and motion control
for second optical table |
Eric Edwards |
|
| SPEC interface to video frame
grabber board |
Arthur Woll |
|
| Aug. 05 |
D1 labyrinth overhauled |
Jerry
Houghton |
| motor macros for new optical
table implemented and tested |
DS |
|
| commissioning of new optical
table |
DS, EE, LG |
|
| xz stage repaired |
Lee Geiger |
|
| new D1 SAXS cabinet |
Chris Conolly |
|
| custom rack in hutch for new
motion control system |
Jerry
Houghton |
|
| Sep. 05 |
D1 main optical table overhaul | Jerry
Houghton |
| new motion control for D1 main
optical table |
Eric Edwards |
|
| design of V mounts for new
flightpath |
DS |
|
| Oct. 05 |
commissioning of main optical
table |
DS |
| leak test of incident flight
path, several problems fixed |
Ellen
Kathan, DS |
|
| machining of V mounts for new
modular flightpath |
John Kopsa |
|
| assembly of new flightpath with
integrated beam stop |
DS |
|
| Nov. 05 |
commissioning of new flightpath
and using it in user experiments |
DS |
| switch of si slit and Itot ion chamber in D1 cave for
better line-up at high x-ray energies |
DS |
|
| monochromator calibration for
30A multilayer |
DS |
|
| Jan. 06 |
new motion control in optics
cave (16 channels); new motion control in hutch (16 channels in addition to 16 channels integrated in the optical tables) prepare to switch to CHESS private network |
Eric Edwards Ted Luddy Lee Geiger |
| fix of some software problems in
SPEC - Compumotor controller interface |
Eric Edwards |
|
| switch D1 Compumotor motion
control over to CHESS private network |
Eric Edwards |
|
| monochromator calibration for
15A multilayer |
DS |
|
| Feb. 06 |
fix of D-line door: rails had
come loose |
Dana Richter |
| dual detector set-up for
fluorescence imaging |
Judson
Powers, DS |
|
| SPEC macros for dual detector
set-up |
Phil Sorensen |
|
| Mar. 06 |
full fix of D-line hutch door during down | Jerry
Houghton |
| remove StepPak system and recable D1 | Chris Conolly | |
| remove manual wiggler
controlbox to D-line roof |
Jeff White |
|
| clean up hutch labyrinths on roof |
Jeff White+DS |
|
| Apr. 06 |
commission Compumotor motion control system (this down and start-up of May run) | DS+Lee Geiger |
| test and maintenance on heat exchanger for MedOptics CCD | Chris Connolly | |
| new multilayer (Mo:B4C,
21A): order substrates |
Darren Dale |
|
| re-organize cabling for MedOptics CCD crate | Dave Jones,
DS |
|
| Aug. 06 |
new D-line cockpit |
Dave Jones |
| new D-line desk |
Dave Jones |
|
| set up VME crate to replace D1 CAMAC: counter/timer, ADC, DAC, digital I/O | Ted Luddy D. Chamberlain |
|
| this down |
move safety system to new crates |
(Jeff White) |
| recable control system |
(DS+ Lee
Geiger?) |
|
| rewrite CCD macros for VME DIO
card |
(Phil
Sorensen) |
|
| commission station |
(DS) |
|
| SAXS beamstop flange (Lesker) |
(DS) |
|
| WAXS conical He/vacuum flight
path (MDC) |
(DS) |
|
| ongoing |
maintenance/tests on D1 CAMAC
crate to avoid controller error (may be obsolete) |
(Phil) |
| fix CAMAC counter/timer (may be
obsolete) |
(Phil) |
|
| purchasing
chiller for MedOptics : consult Mark Tate |
(DS) |
|
| eliminate some minor bugs in MedOptics control logic | (Phil, DS) |
|
| implement Ctrl-C handling in SPEC-MedOptics interface to stop exposure | (Phil, DS) |
|
| commission third set of ADC slits | (DS) | |
| order back-up 1/2" Uniblitz
shutter |
(DS) |
|
| send in large Uniblitz shutter
for
maintenance |
(DS) |
|
| order oil-free pump for
flightpath |
||
| diode beamstop for SAXS flight
path |
||
| biggies |
buy vertical bender for scanning
GISAXS/GIWAXS |
(DS) |
| vacuum in mono box |
(EF, CC, DS) |
|
| ML bender |
(Savino+DS) |