Time period |
Job |
Suspect |
Aug. 04 |
reconfigure slit system to
bypass broken ADC slits |
Detlef
Smilgies |
clean and resolder white beam
slits |
Jim Savino |
|
design and manufacture of new
mounts for 4"
multilayers |
Alan Pauling |
|
install and leak-check new mounts |
Bob Seeley |
|
install and commission new 4"
multilayers (Mo:B4C, 30A) |
Detlef Smilgies | |
Sep. 04 |
new video patch panels |
Tony Lloyd |
new CCD patch panels |
Tony Lloyd |
|
8 new outlets for clean 110V AC
power |
Dave Jones |
|
3-point mount for optical table |
Jerry
Houghton |
|
2nd leg for optical bench |
Jerry Houghton | |
network switch between CCD
computer and control computer |
Frank Labonte |
|
Oct. 04 |
rewiring video channels |
Detlef
Smilgies |
rewiring cables for CCD-spec
interface |
Detlef Smilgies | |
new monitor ion chamber |
Alan Pauling |
|
cooling water interlock for
Medoptics |
Tony Lloyd |
|
new triax cables for Medoptics |
Ted Luddy |
|
improved insulated mount for CCD |
John Kopsa |
|
interface plate for new ADC slit |
John Kopsa |
|
new binning mode for Medoptics |
Arthur Woll |
|
setting up new ADC slit |
Detlef
Smilgies |
|
SAXS flight path mark 2 |
Detlef
Smilgies |
|
GISAXS sample stage and GISAXS
beam stop mark 2 |
Detlef
Smilgies |
|
Nov. 04 |
reinstalled old holder for 3"
multilayers |
Chris
Connolly |
tested 15A W:B4C multilayers from A. Kazimirov for high energies up to 30 keV | Detlef
Smilgies |
|
Jan. 05 |
moved the Be window upstream to
the end of the monobox |
Chris Connolly |
Feb. 05 |
design for ion chamber and slit
support on CHESS xz stage in D-cave |
Detlef
Smilgies |
design for two CF-6 3/4" to KF50
adapter for incident flightpath Kapton windows |
Alan Pauling |
|
moved air conditioner unit to
create more space for large scanner of Woll et al. |
Jerry
Houghton |
|
Mar. 05 |
machined
new incident flight path parts |
John Kopsa |
modified hygrometer and
overpressure valve assembly |
Chris
Connolly |
|
installed, cabled, and tested
"si"
slits and "Itot" ion chamber in D cave |
DS |
|
installation of new SPEC macro structure (Sorensen, Woll, Smilgies) | Phil Sorensen |
|
installation of SPEC multiple
configuration set-up: saxs / image / radio |
DS |
|
cleaned up specuser directory on
d1 |
DS | |
macros for moving data
directories to "offsite" mass storage |
Phil Sorensen |
|
redid cabling from East cross connect patch panel to D-line main control panel | Tony Lloyd |
|
got station PC off the floor | Chris Connolly | |
SAXS parts (sample holder for capillaries, beam stop, to be used with CHESS xz stage) | DS |
|
SAXS accessories (thin-walled
glass capillaries, microdispenser) |
DS | |
main optical table maintenance |
Jerry
Houghton |
|
align Kapton window and 6" beampipe through cave-hutch shielding wall | DS | |
reassemble and commission reconfigured SAXS setup (mark 3) | DS | |
improve old GISAXS stage: center
of samaz rotation at sample, closed sample cell |
DS | |
local mirror in hutch (CHESS
repolished quartz mirror, cleaned mirror piece) |
Conolly/Savino |
|
one 3rd generation ADC slit is
working, one repaired, one to be tested |
DS | |
improved Medoptics mount;
Medoptics was rotated 90 deg for easier use with "fit2d" |
DS | |
Jul. 05 |
second ADC slit configured and
commissioned (sh) |
DS |
OSMIC 15 A W:B4C multilayers
commissioned at 30 keV |
DS |
|
vacuum flight path components
based on ISO-100/KF-50 ordered |
DS |
|
vacuum sample cell designed and
ordered |
DS |
|
simple solvent vapor cell built
and tested |
DS, PB |
|
moved garage door controller lower | DS |
|
macro motors for sg and sh slits |
DS |
|
second optical table for
detectors (Medoptics) assembled |
Jerry
Houghton |
|
motor wiring and motion control
for second optical table |
Eric Edwards |
|
SPEC interface to video frame
grabber board |
Arthur Woll |
|
Aug. 05 |
D1 labyrinth overhauled |
Jerry
Houghton |
motor macros for new optical
table implemented and tested |
DS |
|
commissioning of new optical
table |
DS, EE, LG |
|
xz stage repaired |
Lee Geiger |
|
new D1 SAXS cabinet |
Chris Conolly |
|
custom rack in hutch for new
motion control system |
Jerry
Houghton |
|
Sep. 05 |
D1 main optical table overhaul | Jerry
Houghton |
new motion control for D1 main
optical table |
Eric Edwards |
|
design of V mounts for new
flightpath |
DS |
|
Oct. 05 |
commissioning of main optical
table |
DS |
leak test of incident flight
path, several problems fixed |
Ellen
Kathan, DS |
|
machining of V mounts for new
modular flightpath |
John Kopsa |
|
assembly of new flightpath with
integrated beam stop |
DS |
|
Nov. 05 |
commissioning of new flightpath
and using it in user experiments |
DS |
switch of si slit and Itot ion chamber in D1 cave for
better line-up at high x-ray energies |
DS |
|
monochromator calibration for
30A multilayer |
DS |
|
Jan. 06 |
new motion control in optics
cave (16 channels); new motion control in hutch (16 channels in addition to 16 channels integrated in the optical tables) prepare to switch to CHESS private network |
Eric Edwards Ted Luddy Lee Geiger |
fix of some software problems in
SPEC - Compumotor controller interface |
Eric Edwards |
|
switch D1 Compumotor motion
control over to CHESS private network |
Eric Edwards |
|
monochromator calibration for
15A multilayer |
DS |
|
Feb. 06 |
fix of D-line door: rails had
come loose |
Dana Richter |
dual detector set-up for
fluorescence imaging |
Judson
Powers, DS |
|
SPEC macros for dual detector
set-up |
Phil Sorensen |
|
Mar. 06 |
full fix of D-line hutch door during down | Jerry
Houghton |
remove StepPak system and recable D1 | Chris Conolly | |
remove manual wiggler
controlbox to D-line roof |
Jeff White |
|
clean up hutch labyrinths on roof |
Jeff White+DS |
|
Apr. 06 |
commission Compumotor motion control system (this down and start-up of May run) | DS+Lee Geiger |
test and maintenance on heat exchanger for MedOptics CCD | Chris Connolly | |
new multilayer (Mo:B4C,
21A): order substrates |
Darren Dale |
|
re-organize cabling for MedOptics CCD crate | Dave Jones,
DS |
|
Aug. 06 |
new D-line cockpit |
Dave Jones |
new D-line desk |
Dave Jones |
|
set up VME crate to replace D1 CAMAC: counter/timer, ADC, DAC, digital I/O | Ted Luddy D. Chamberlain |
|
this down |
move safety system to new crates |
(Jeff White) |
recable control system |
(DS+ Lee
Geiger?) |
|
rewrite CCD macros for VME DIO
card |
(Phil
Sorensen) |
|
commission station |
(DS) |
|
SAXS beamstop flange (Lesker) |
(DS) |
|
WAXS conical He/vacuum flight
path (MDC) |
(DS) |
|
ongoing |
maintenance/tests on D1 CAMAC
crate to avoid controller error (may be obsolete) |
(Phil) |
fix CAMAC counter/timer (may be
obsolete) |
(Phil) |
|
purchasing
chiller for MedOptics : consult Mark Tate |
(DS) |
|
eliminate some minor bugs in MedOptics control logic | (Phil, DS) |
|
implement Ctrl-C handling in SPEC-MedOptics interface to stop exposure | (Phil, DS) |
|
commission third set of ADC slits | (DS) | |
order back-up 1/2" Uniblitz
shutter |
(DS) |
|
send in large Uniblitz shutter
for
maintenance |
(DS) |
|
order oil-free pump for
flightpath |
||
diode beamstop for SAXS flight
path |
||
biggies |
buy vertical bender for scanning
GISAXS/GIWAXS |
(DS) |
vacuum in mono box |
(EF, CC, DS) |
|
ML bender |
(Savino+DS) |