2010.05.03 - New Sextupoles
Starting with DLR's sextupole distribution, try two new
optimization schemes:
- Remove constraints on h11001, h00111 (chromaticity-driving terms)
and optimize
- Remove above constraints, and additionally drive xi.x
and xi.y toward 0.5; optimize.
DLR Sextupole Distribution
Optimized lattice
cons_sext.in
Merit contributions



Remove h11001, h00111
Optimized lattice
cons_sext.in
Merit contributions



Remove h11001, h00111; xi.x, xi.y driven toward 0.5
Optimized lattice
cons_sext.in
Merit contributions



Drive xi.x, xi.y toward 0.0
For completeness, repeat, starting with DLR's sextupole
distribution and driving xi.x, xi.y to 0.5, but this time drive
chromaticities to zero. (Everything else identical.)
Optimized lattice
cons_sext.in
Merit contributions



Back