Skip to main content

more options


1999

RF Measurements on a Cu Model of the Superstructure for the TESLA Linear Collider
H. Chen, M. Ferrario, G. Kreps, M. Liepe, V. Puntus, J. Sekutowicz, in Proc. of the 9th Workshop on RF Superconductivity, Santa Fe, NM, (1999).
Nb Prototype of the Superstructure for the TESLA Linear Collider
R. Bandelmann et al., in Proc. of the 9th Workshop on RF Superconductivity, Santa Fe, NM, (1999).
High-Field Q Slope in S.C. Cavities Due to Magnetic Field Enhancement at Grain Boundaries
R.L. Geng, J. Knobloch, M. Liepe, H. Padamsee, in Proc. of the 9th Workshop on RF Superconductivity, Santa Fe, NM, (1999).

1998

Field Control in Superconducting Cavities with Beam Loading
M. Liepe, Diploma thesis, Universitaet Hamburg, (1998).
Design of the RF Phase Reference System and Timing Control for the TESLA Linear Collider
A. Gamp, M. Liepe, T. Plawski, K. Rehlich, S.N. Simrock, in Proc. of the XIX Linac Conference, Chicago, IL, p. 204, (1998).
Adaptive Feed Forward for the Digital RF Control System at the TESLA Test Facility
M. Liepe, S. N. Simrock, in Proc. of the 1998 European Particle Accelerator Conference, Stockholm, Sweden, p. 1735, (1998).
Experience with the Control of the Vector Sum at the TESLA Test Facility,
A. Gamp et al., in Proc. of the 1998 European Particle Accelerator Conference, Stockholm, Sweden, p. 1738, (1998).

1997

Real Time Digital RF Control for the TESLA Test Facility
K. Rehlich et al., in Proc. of the 10th IEEE Real Time Conference, Beaune, France, (1997).

EB welding

Electron beam welding of a superconducting RF cavity.