Bypass Layout - vacuum (pptx) | November 21, 2018 | A. Cao |
Define Normalized Cooling Rate | November 20, 2018 | W. Bergan |
Optimize Cooling Rate | November 13, 2018 | W. Bergan |
Goals for Cooling: Longitudinal Cooling Constraints | November 6, 2018 | W. Bergan |
Bypass Optics with New Undulator Model | October 30, 2018 | W. Bergan |
OSC lattice - various undulator models | October 22, 2018 | M. Ehrlichman |
Refined OSC lattice. Omit Q0 | October 16, 2018 | M. Ehrlichman |
Bypass mechanical design v2 (pptx) | September 25, 2018 | A. Cao |
Bypass. No Q0 | September 25, 2018 | M. Ehrlichman |
Bypass. 0.75m bends | September 9, 2018 | M. Ehrlichman |
L3 OSC Vacuum System and pptx | September 12, 2018 | A. Cao |
0.65-0.85 bypass dipole design | August 29, 2018 | M. Ehrlichman |
L3 Bypass Mockup - 8/29 and pptx | August 29, 2018 | A. Cao |
L3 Bypass Mockup - 8/12 | August 22, 2018 | A. Cao |
Bypass Nonlinearity and pptx | August 22, 2018 | D. Rubin |
L3 Mockup - 8/15 | August 15, 2018 | A. Cao |
Chicane dipoles for OSC | August 8, 2018 | M. Ehrlichman |
Bypass sextupole nonlinearity | August 8, 2018 | S. Wang |
L3 Mockup - version 2 | August 8, 2018 | A. Cao |
Layout - version 1.5 | August 1, 2018 | A. Cao |
Bypass - 50 cm bends and | July 25, 2018 | D. Rubin |
Layout v1 | July 25, 2018 | A. Cao |
Bypass and ring optics- update and pptx | July 18, 2018 | D. Rubin |
Bypass and ring optics and pdf | July 2, 2018 | D. Rubin |
Q3 large aperture drawing | July 2, 2018 | D. Rubin |
2mm Bypass | June 27, 2018 | D. Rubin |
Bypass and rules | June 20, 2018 | D. Rubin |
Middle Route Bypass | May 11, 2018 | M. Ehrlichman |
IOTA design | March 27, 2018 | M. Ehrlichman |
Notes on bypass | March 13, 2018 | M. Ehrlichman |
13 cm QQ leg | March 20, 2018 | M. Ehrlichman |
Minimalist w match elements | March 13, 2018 | M. Ehrlichman |
Notes on IOTA bypass | March 13, 2018 | M. Ehrlichman |
Iota ref | March 13, 2018 | M. Ehrlichman |
20cm bypass | March 9, 2018 | M. Ehrlichman |
RDT sextupole optimization lattice with 40cm bypass. | March 6, 2018, | M. Ehrlichman |
40 cm bypass matched into CESR ring optics. | February 16, 2018, | M. Ehrlichman |
40 cm bypass matched to 500 MeV CHESS-U. | February 9, 2018 | M. Ehrlichman |
40 cm bypass damping envelope. | February 6, 2018, | M. Ehrlichman |
Isochronous and TT 40cm bypass | January 25, 2018 | M. Ehrlichman & J.Shanks |
OSC isochronous quad strengths | January 23, 2018 | M. Ehrlichman |
OSC Bend Strengths | January 12, 2018, | M. Ehrlichman |
CHESS-U TTOSC 5.3 mm delay Match 1. | December 12, 2017, | M. Ehrlichman |
Isochronous/180 degree TT | December 8, 2017 | M.Ehrlichman, |
symmetric, 3.5mm bypass | November 28, 2017 | M. Ehrlichman |
Beam envelope | October 9, 2017 | M. Ehrlichman, |
Bypass constraints - various delay | September 29, 2017 | M. Ehrlichman |
Various delay lengths | September | M. Ehrlichman |
bypass 1 | September 19, 2017 | M. Ehrlichman |
bypass 2 | September 26, 2017 | M. Ehrlichman |